Key facts
| Fact | What applies | Basis |
|---|---|---|
Ownership | Only on registration in the Public Registry; a contract and payment are not enough | |
Your future apartment | A preliminary registration of your right, made under your contract, blocks registering any other right to it by transaction, unless the contract provides otherwise | |
Construction permit | Issued by Batumi City Hall in two stages; if it expires before completion, a new one is needed | |
Before acceptance | By law (permits from 1 January 2022) the building may not be used and gets no permanent electricity or gas. In Batumi people still live in unaccepted buildings for years, paying for power and gas through the developer — but the apartment cannot be registered separately until the building is accepted |
7 steps, from the cheapest check to the most expensive
The first steps take minutes and public data, the last ones a lawyer’s time. Stop at the first step that fails: if a project fails the first two, you will not need to pay a lawyer at all. Ask in writing and keep the answers: a good answer is a document, a number or an address, not a promise.
01Identify the company
Ask for the legal name and identification number of the company that signs the contract and find it in the Public Registry’s registry of entrepreneurs. The brand on the billboard is not always that company.
Stop if: The company is not in the land or permit documents.
02Read the land extract
Ask for the plot’s cadastral code and read its Public Registry extract: owner, mortgages, attachments. Anyone can request it — no consent from the developer is needed. Order a fresh extract before the deposit and again on the day you sign.
Stop if: An attachment or dispute; or the owner is not the developer and there is no written right to build.
03Compare the permit with what is sold
Get a copy of the permit with its number and date and compare plot, floors and use with the building on sale. By law, permit applications and documents are published on the cadastral map, tied to the plot (Spatial Planning Code, art. 101¹): ask where the decision for this project is published, and have it confirmed through the City Hall or by your lawyer.
Stop if: Apartments are sold above the permitted floors, or the permit is only “coming soon”.
04Visit buildings it has delivered
Two or three addresses, not renders. Check that they were accepted into operation and that the apartments are registered to owners; ask owners about deadlines and quality.
Stop if: People have lived there for years without an acceptance act, or the apartments are still not registered.
05Check the payment schedule
In Batumi it is usually a 20–30% down payment and an interest-free monthly installment plan by dates until completion; some projects take a large payment at handover or spread installments after it. Before each payment, check on site or on a live video call that the work is on schedule, and see what the contract says if construction falls behind. If the land is mortgaged to a bank, the contract must say how your apartment will be released.
Stop if: Payment details are not those of the company in the contract and the registry, or the land mortgage has no written release mechanism.
06Read the contract with your own lawyer
Before signing: handover date and penalty, specification annex, area tolerance, refund if construction stops, the terms for assigning the contract before completion, and deadlines for acceptance and registration. Adding these after signing is much harder.
Stop if: The contract is “standard and cannot be changed”, and these clauses are missing.
07Register the preliminary contract
Before the first payment, in the Public Registry: a preliminary registration of your right under the contract (art. 12) or the developer’s registered obligation to transfer the apartment (art. 15⁶) — your lawyer chooses which. It does not make you the owner, but while the entry stands, other rights to the same apartment are not registered unless the contract provides otherwise.
Stop if: The developer refuses or says it can be done “after completion”.
Brochure promises and what to ask for instead
| The brochure says | Ask for |
|---|---|
“Completion in 2027” | A date and a penalty in the contract |
“Premium materials” | A specification annex with brands and models |
“Fully legal project” | The permit number, stage and expiry date |
“Guaranteed rental income” | The management contract: who pays and who covers a shortfall |
“Sea view” | What may be built on the plots in front |
“Only a few apartments left” | Nothing — take the time your checks need |
A promise becomes your right only when it is written into the contract or its annex.
Your document folder
If a document is missing when its moment comes, stop and ask why — before the next payment. The purchase is complete only when the extract names you as owner.
| Moment | Document | Issued by |
|---|---|---|
Before any payment | Extracts for the land and the company; permit and approved project | Public Registry; Batumi City Hall |
Signing | Contract, specification annex, payment schedule | Developer and buyer |
Before the first payment | Registered preliminary contract | Public Registry |
During construction | Payment confirmations; dated photos of the site | Bank; you or your representative |
Completion | Act of acceptance into operation | Authorized body |
Handover | Handover act with a list of defects | Developer and buyer |
End | Extract naming you as owner | Public Registry |
Two typical situations
Typical situation
The land is not in the developer’s name
The owner is a private individual; the developer’s company builds. What decides is the agreement between them — joint activity, lease or a right of superficies — and what happens to buyers if it ends.
What decides: Is there a written right to build?
Typical situation
Keys without an acceptance act
The building looks finished; the documents “will follow”. For a permit issued from 2022, the law forbids using the building before acceptance and connecting permanent utilities; in practice people live there anyway, but the apartment is not registered. If the contract allows, hold back the last payment until acceptance and registration.
What decides: When is the acceptance act, and when is my registration?
Frequently asked questions
Is a bank mortgage on the developer’s land a red flag?
Not by itself — banks often finance projects. What matters is a written mechanism for releasing your apartment. An attachment, unlike a mortgage, is a reason to stop.
Do you check developers before offering their apartments?
Yes. A project that fails our check is not offered — see “How we verify a property”. A legal opinion on your contract is given by an independent lawyer you choose.
Considering a specific project? Send its name and cadastral code — in the first conversation we will tell you what to ask the developer for.
Ask a questionSources
- Civil Code of Georgia — Legislative Herald of Georgia (matsne.gov.ge) · 2026, arts 183 · viewed 11 November 2026 (opens in a new tab)
- Code of Georgia on Spatial Planning, Architectural and Construction Activities — Legislative Herald of Georgia · 2026, arts 100, 101, 101¹, 112, 139¹ · viewed 11 November 2026 (opens in a new tab)
- Law of Georgia №722 of 12 July 2021 amending the Spatial Planning Code · 2021, arts 1–2 · viewed 11 November 2026 (opens in a new tab)
- Law of Georgia on the Public Registry — Legislative Herald of Georgia · 2026, arts 12, 15⁶ · viewed 11 November 2026 (opens in a new tab)
- Apsny.ge, citing Batumelebi — Batumi buildings not accepted into operation and built beyond permits · 8 May 2025 · viewed 12 November 2026 (opens in a new tab)
- Batumelebi — Batumi City Hall moves permit work to a new legal entity · 2026 · viewed 11 November 2026 (opens in a new tab)
Change history
- · Payments: a schedule by dates is normal practice (Levan); the guide now asks to check progress before each payment and what the contract says about delays. Removed the escrow line — the bank product we describe is not for developer purchases. Assignment: what matters is knowing the terms, a ban or a fee is possible.
- · Clarified at Levan’s request: before acceptance the law forbids using the building, but in Batumi people live in unaccepted buildings — the risk for the buyer is that the apartment cannot be registered.
- · Read by Levan Tabidze. Article 12 wording made exact: other rights are not registered while the entry stands, unless the contract provides otherwise.
- · Checked against Georgian practice (agency guides) and the Law on the Public Registry: registration basis (arts 12, 15⁶), permit publication on the cadastral map (art. 101¹), fresh extract twice, payment only to the contract company, right of assignment.
- · Guide published. The same day shortened by half: each fact appears once. Laws checked on matsne on 11 November 2026.